> Here's the preliminary release schedule: > > 2014-08-12 Feature freeze > 2014-08-13 Tag 1.1.1-rc1 in Git. > Build and upload 1.1.1-rc1 ISO/IUKs. > 2014-08-14 Test 1.1.1-rc1 > 2014-08-15 Release 1.1.1-rc1
Aren't we supposed to skip RC for a point release? Or did I miss something? -- sajolida
signature.asc
Description: OpenPGP digital signature
_______________________________________________ Tails-dev mailing list [email protected] https://mailman.boum.org/listinfo/tails-dev To unsubscribe from this list, send an empty email to [email protected].
