2011/1/28 Richard Mann <[email protected]>

> On Thu, Jan 27, 2011 at 9:06 PM, Michael von Glasow
> <[email protected]> wrote:
> > Following the call for a better proposal, Tiziano, Oscar and I have
> drafted
> > up a simple proposal. It is based on how we have mapped the public
> transport
> > networks in our cities (Padova, Ferrara and Milan), with some
> improvements
> > that came up during this discussion.
> >
> > Our approach was to keep it simple, therefore we have deliberately not
> > treated special cases. For now, we want to standardize the basics; once
> we
> > have agreed on those, we can discuss special cases which might not be
> > covered by the current proposal and draw up an amendment, to be decided
> > separately.
> >
> > You can find the proposal at:
> >
> >
> http://wiki.openstreetmap.org/wiki/Proposed_features/Simplified_Public_Transport_Scheme
> >
> > Constructive feedback and suggestions are welcome and can be sent to the
> > list or left on the proposal's discussion page.
>
> Many thanks for this.
>
> 1) How do you envisage the mapping of loops (ie (say) six stops on
> one-way loop at one end of the route). I guess the two directions
> could be combined, or an arbitrary break made at some point round the
> loop. I think you need to suggest either one or the other or say that
> both are acceptable as long as they are ordered.
>

You look at the schedule for that line and determine which one is considered
the terminus by the PT company.

Jo
_______________________________________________
Talk-transit mailing list
[email protected]
http://lists.openstreetmap.org/listinfo/talk-transit

Reply via email to