David Groom wrote: > Does thtis mean that in theory when creating a "T" junction it would > be > better to start from the existing way, insert a node, and then draw > the new > way "away" from the exisitng way, rather than to start a new way and > move > towards the exiting way and join on to that existing way?
It doesn't really matter as long as the new way doesn't upload until the old way has uploaded. I just wait for the ID to turn positive before starting a branching way. But I do it with a slightly guilty feeling that I should really apply some brainpower to working out how to fix this. cheers Richard _______________________________________________ talk mailing list [email protected] http://lists.openstreetmap.org/listinfo/talk

