... i made a github pull request to make incorporation easy.
https://github.com/therion/test/pull/6

Howevr, i do not know if that repository is the projects central main code base?

Greetings,
Beni



Am 2016-11-25 22:17, schrieb Benedikt Hallinger via Therion:
Hi there, here the updated version.



Am 2016-11-10 18:15, schrieb Benedikt Hallinger:
Oops, yes, thank you for spotting this!
It must read 0.125 of course!

Am 2016-11-09 15:21, schrieb Footleg:
This looks potentially very useful, but I have not yet explored defining sd settings in my survey data. So I may need to learn a bit more in order to use it.

I spotted one potential error? In the grade 6 section, the compass bearing is to 0.125 degrees. But the clino is stated as 1.125 degrees. I think both should be 0.125 right?

Footleg

On Mon, Nov 7, 2016 at 10:17 PM Benedikt Hallinger <b...@hallinger.org [4]> wrote:

Hello,

for a recent project i made a grades file (based on the BCRE-example in
therion distribution) for UISv1 specifications (see attachment).
It would be a pleasure for me if it is useful to somebody; it would also be
very nice if i could get some feedback on it.

With the naming i had the intention that exporting from databases is easily
doable. The prefix is "UISv1_" followed by the actual grades number.
I included all the grades to faciliate documentation inside the th-files, so
one can stright export "-1" surveys too.

With best regards,
Benedikt Hallinger

For better archiving and searchability, here is the code reproduced:
---------------- UISv1Grades.th -------------
encoding utf-8
# UIS Grades - International standard grades specification
#   from: http://www.uisic.uis-speleo.org/UISmappingGrades.pdf [1]
# Version 2 from 14 Sep 2012 (cosmetic update; UISv1 values still apply)
#
# Note: UIS standards says nothing about accuracy of the stations
#       positions, so it is probably good practice to include a
#       "sd position <value> <units>" definition in your centrelines.
#

# Grade -1: no map available
# Only for database purposes: It means that the cave map has not been drawn
yet.
grade "UISv1_-1" -title "UISv1 ungraded survey without map"
   # Not applicaple for therion data.
   # It is mainly here to support automated data exports from
   # databases wich may export such a number.
endgrade

# Grade 0: ungraded
# Only for database purposes. If a cave survey is ungraded, its quality
cannot be
# assessed. This is most usually true for historic or otherwise old maps.
grade "UISv1_0" -title "UISv1 ungraded survey"
   # Nothing defined here.
   # Specifying such an grade may be useful to document that the survey was    # not graded. As it is documented in the *.th-datafiles it may easily be
   # searched for. Use it as a kind of "todo" flag...
endgrade

# Grade 1: sketch from memory, not to scale
grade "UISv1_1" -title "UISv1 survey grade 1"
   # nothing defined here.
   # Specifying such an grade may be useful to document that the survey was
   # just the result of a sketch and shpuld be redone.
endgrade

# Grade 2: No instruments, from annotations/sketches/estimates
# Map compiled from annotations, sketches and estimates made
# in the cave. No instruments used.
grade "UISv1_2" -title "UISv1 survey grade 2"
   # nothing defined here.
   # Specifying such an grade may be useful to document that the survey
   # was the result of sketches/annotations in the cave.
endgrade

# Grade 3: Rough magnetic/analogue survey
# Directions measured by compass, distances measured by chord,
# pace, or body dimensions. Significant slopes estimated.
#
# A Silva clinometer or comparable, relatively simple means without precise # readings qualify for grade 3. Mapping from head to head of the surveyors # qualifies only for grade 3. Topofil measurements qualify generally for
# grade 3 or 4.
grade "UISv1_3" -title "UISv1 survey grade 3"

   # 95.44% of readings are within 0.5m (2 S.D.)
   length 0.25 metres

   # 95.44% of readings are within 5.0 degrees (2 S.D.)
   bearing 2.50 degrees

   # 95.44% of readings are within 30.0 degrees (2 S.D.)
   # (estimating is allowed, no measurement needed - value guessed by me)
   gradient 15.0 degrees

   # UIS specifications say nothing about station position accuracy.
   # Add "sd position <value> <units>" to your centreline.

endgrade

# Grade 4: Magnetic survey
# Compass and tape survey, using deliberately chosen and fixed
# stations. Slopes measured by clinometer or horizontal and vertical
# components of line.
#
# Topofil measurements may qualify for grade 4 if the survey shots are not
too
# long and care is given to correctly read all data. Laser rangefinder can
be
# used throughout grades 4 to 5. In order to attain grade 4, fixed and
# re-findable survey stations must be made. They have not to be necessarily
on
# the walls; tripod-mounted points with a defined length above the floor are
# also accepted
grade "UISv1_4" -title "UISv1 survey grade 4"

   # 95.44% of readings are within 0.1m (2 S.D.)
   length 0.05 metres

   # 95.44% of readings are within 2.0 degrees (2 S.D.)
   bearing 1.00 degrees

   # 95.44% of readings are within 2.0 degrees (2 S.D.)
   gradient 1.00 degrees

   # UIS specifications say nothing about station position accuracy.
   # Add "sd position <value> <units>" to your centreline.

endgrade

# Grade 5:
# Compass and tape survey. Directions and slope by calibrated
# instruments, distances by fibreglass or metallic tape, or tachometry.
#
# Calibrated DistoX, DUSI or comparable instruments attain grade 5. With a # calibration of the length measurement, they attain grade 6. If they are # uncalibrated, they are to be graded with 1! Topofil used for vertical pits # may reach grade 5. In order to reach grade 5, the survey coordinates have
to
# be calculated (xyz coordinates, no polar coordinates plotted with scale
rule
# a d protactor).
grade "UISv1_5" -title "UISv1 survey grade 5"

   # 95.44% of readings are within 0.05m (2 S.D.)
   length 0.025 metres

   # 95.44% of readings are within 1.0 degrees (2 S.D.)
   bearing 0.5 degrees

   # 95.44% of readings are within 1.0 degrees (2 S.D.)
   gradient 0.5 degrees

   # UIS specifications say nothing about station position accuracy.
   # Add "sd position <value> <units>" to your centreline.

endgrade

# Grade 6:
# Survey or triangulation using calibrated, tripod-mounted instruments
# for directions and slope. Distances by calibrated tape, precise
# tacheometry, or calibrated DistoX type (angles and length).
grade "UISv1_6" -title "UISv1 survey grade 6"

   # 95.44% of readings are within 0.02m (2 S.D.)
   length 0.01 metres

   # 95.44% of readings are within 0.25 degrees (2 S.D.)
   bearing 0.125 degrees

   # 95.44% of readings are within 0.25 degrees (2 S.D.)
   gradient 1.125 degrees

   # UIS specifications say nothing about station position accuracy.
   # Add "sd position <value> <units>" to your centreline.

endgrade

# Grade X: Survey by theodolite or comparable means
# Theodolite models or other similar equipment may vary as well as the
measuring
# techniques. Therefore, all grade X surveys must include, in the written # description of the cave, descriptions of the instruments and techniques
used
# as well as an estimate of the probable accuracy of the survey.
grade "UISv1_X" -title "UISv1 survey grade X"
   # Details must be laid out at the survey.
   # custom "sd ... <value> <units>" have to be specified for your
centrelines!
   #
   # That said, a construction site thedolite is about 0.08 gon
   # and a engineering theodolite about 0.02 gon.
   # Example: "sd bearing gradient 0.08 grad" # theodolite
endgrade
-------------------- E O F ------------------_______________________________________________
Therion mailing list
Therion@speleo.sk [2]
https://mailman.speleo.sk/listinfo/therion [3]


Links:
------
[1] http://www.uisic.uis-speleo.org/UISmappingGrades.pdf
[2] mailto:Therion@speleo.sk
[3] https://mailman.speleo.sk/listinfo/therion
[4] mailto:b...@hallinger.org

_______________________________________________
Therion mailing list
Therion@speleo.sk
https://mailman.speleo.sk/listinfo/therion

_______________________________________________
Therion mailing list
Therion@speleo.sk
https://mailman.speleo.sk/listinfo/therion

Reply via email to