Bruce Griffiths wrote:
System constraints arent necessarily due to cost constraints.
The constraints may be imposed by experience limitations and the learning curve associated with FPGAs etc.

The level of design ability needed is still moderate, and for a skilled designer, the effort to produce one for a friend in need is moderate. The I/O is probably going to cause more head-ache than the measurement engine anyway. Even a serial port with binary data takes some care in designing.

If one already has a high end DSP in the system its almost possible (with the right DSP) to implement the multichannel time tagging purely in software.

Getting it right with a DSP could be just as challenging.

Cheers,
Magnus

_______________________________________________
time-nuts mailing list -- [email protected]
To unsubscribe, go to https://www.febo.com/cgi-bin/mailman/listinfo/time-nuts
and follow the instructions there.

Reply via email to