John Trovato writes in part: > The most stringent test requirements that > I know of are those outlined in the Australian deviations to 950, which > require both the dielectric and impulse tests to be applied. Australia > used to require supplementary insulation between TNV and SELV, even on E1 > circuits, based on 250 volts. That is no longer the case with amendment 4.
In Australia you can have a SELV NTU installed at the customer premise. I don't know if an extra charge is involved. Apparently amd. 4 catches up with this route. You can always be assured permission to connect in any CP installation if you have supplementary @250V. -- Dan Roman | mailto:[email protected] http://www.dialogic.com Compliance Engineer | Personal: mailto:[email protected] Dialogic Corp, NJ | Homebrew is better brew!
