Hello George,

I agree that the unit in question passes the test according to 
UL1950. I raise the question if the test would be repeated "n" 
number of times, would acceptable results be obtained each time? 
As a matter of fact, in our case, we conducted the test twice on 
different samples and obtained the same results. 

Thank you for your comments. 

> Hello Peter,
> 
> The objective of these tests is to ensure that there will be no shorting
> which would create an electrical shock hazard.  This is not an
> operational test.. the product isn't expected to operate after this
> test.. The post dielectric test is used to verify if any shorting
> conditions have occurred as a result of the OVT that would create a
> shock hazard. To answer your question, Yes, your scenario below would be
> an acceptable result.
> 
> Best Regards,
> George
> > -----Original Message-----
> > From:       [email protected] [SMTP:[email protected]]
> > Sent:       Monday, January 04, 1999 4:37 PM
> > To: [email protected]
> > Cc: '[email protected]'
> > Subject:    UL1950 Overvoltage Tests
> > 
> > 
> > Happy New Year to All,
> > 
> > I would like to ask the opinion of all members regarding compliance 
> > criteria for the Overvoltage Tests in on TNV lines connected to 
> > exposed plant. UL1950 states that after the OV Tests, unit must 
> > comply with the Dielectric Voltage Withstand Tests or Leakage 
> > Current Tests.
> > 
> > Assuming that after the OV Tests, some internal traces of the 
> > board opened and caused slight charring on the PCB and the unit 
> > passed all applicable Dielectric Voltage Withstand Tests, would 
> > this be cosnidered an acceptable result?
> > 
> > Looking forward to hearing from all members on this sensitive issue.
> > 
> > 
> > 
> > PETER S. MERGUERIAN
> > MANAGING DIRECTOR
> > PRODUCT TESTING DIVISION
> > I.T.L. (PRODUCT TESTING) LTD.
> > HACHAROSHET 26, P.O.B. 211
> > OR YEHUDA 60251, ISRAEL
> > 
> > TEL: 972-3-5339022
> > FAX: 972-3-5339019
> > E-MAIL: [email protected]
> > Visit our Website: http://www.itl.co.il
> > 
> > ---------
> > This message is coming from the emc-pstc discussion list.
> > To cancel your subscription, send mail to [email protected]
> > with the single line: "unsubscribe emc-pstc" (without the
> > quotes).  For help, send mail to [email protected],
> > [email protected], [email protected], or
> > [email protected] (the list administrators).


PETER S. MERGUERIAN
MANAGING DIRECTOR
PRODUCT TESTING DIVISION
I.T.L. (PRODUCT TESTING) LTD.
HACHAROSHET 26, P.O.B. 211
OR YEHUDA 60251, ISRAEL

TEL: 972-3-5339022
FAX: 972-3-5339019
E-MAIL: [email protected]
Visit our Website: http://www.itl.co.il

Reply via email to