On 1/11/06, Jonathan LaCour <[EMAIL PROTECTED]> wrote:
>
> On Jan 11, 2006, at 10:06 AM, Kevin Dangoor wrote:
> > Which brings me to PasteDeploy. Ian has been keeping up with the
> > CherryPy 2.2 changes and trying to make sure that the level of WSGI
> > support needed for PasteDeploy is met by CP 2.2's more flexible
> > routing. The CP2.2 transition is something we can make for TG0.9, but
> > the PasteDeploy transition is not. I do think that using PasteDeploy
> > is a good goal and that it should be done right when CP is ready for
> > it.
>
> Does this only apply to 0.9, or does it also apply for 1.0?  I have
> no issue with not having Paste Deploy in 0.9, as I can see the clear
> need to get a release out the door.  But, I am worried about having
> the first really frozen release go out the door without Paste Deploy.

Assuming all of the CP issues are dealt with, I can see TurboGears 1.0
using PasteDeploy.

Kevin

Reply via email to