Hello,
Following a withdrawal, I overcapacity on the Netcenter Marseille (France)
If anyone is interested ...
It is in the context of an overall agreement, I am committed on 16 Layer 2
Link
and my customer has decided to cancel the order on this site, so I have two
connections not used or there is a commitment of 9 months.
Technical elements:
- 1Gbit EoMPLS Layer 2 transparent all protocols (spanning tree etc.
..)
- 9200 MTU
- Port 1Gb Fibre Singlemode
- End B to choose from a list of 20 ene DC including DC to Paris / Lyon
- SLA 4H 24/24
NRC and half cross connect (at Netcenter Marseille) are already paid for in
a
overall package, so I leave it to the buyer.
The operator is OK to transfer the contract therefore live with him
I have too 1 Link with a commitment of 12 month (never installed):
Technical elements:
- 1Gbit EoMPLS Layer 2 transparent all protocols (spanning tree etc.
..)
- 9200 MTU
- Port 1Gb Fibre Singlemode
- SLA 4H 24/24
between two of this datacenter:
Telehouse East London
Interxion Frankfurt (FRA3)
Interxion Amsterdam (AMS3)
Interxion Brussels
Interxion Madrid
Telehouse Paris
Equinix Paris
Interxion Paris
this link is a good price because I ordered a bundle.
Contact in MP
sincerely
Lucas.