For example the following run from the msg box:
put the height of grc 1 & return after results set the height of grc 1 to (the height of grc 1) + 0.1 put the height of grc 1 after results put results
Gives:
70 70
As it should. The addition of .1 to the height should have no effect. Graphic 1 is a rectangle.
But
put the height of grc 1 & return after results set the height of grc 1 to (the height of grc 1) - 0.1 put the height of grc 1 after results put results
Gives:
70 69
Whereas it should give
70 70
Subtracting .0000001 from the height also gives
70 69
(The +.1 and -.1 arise from a variable determined from a calculation.)
Mac OS 9, RR 2.1.2
If anyone can confirm this, I will Bugzilla it.
Jim
_______________________________________________ use-revolution mailing list [EMAIL PROTECTED] http://lists.runrev.com/mailman/listinfo/use-revolution
