Jim,

I owe you an apology. You were correct. This problem is tied to daylight savings. I realized that after taking your advice and looking at the list archives. Fortunately, with some suggestions and code from Sarah Reichelt, I was able to workaround the problem, I think. Further testing will tell for sure.

So thank you. And thank you, Sarah, for your wonderful DateTime library. Saved me a lot of work.

Chris

On May 22, 2006, at 10:37 AM, Jim Ault wrote:

If you look in the archives, this topic was recently discussed fairly well. The operating systems do date and time and daylight savings differently. This is inherent in each system. If these calculations are critical to your
operation, you should invest a bit of time building a small date-time
library to add to your distribution.

Hopefully you will find all the data you need to answer your questions, especially if you are going to rely on the users computer settings as being
accurate and in their time zone.

Look at the automatic daylight savings time adjustment for each operating
system, and in other countries, see which day this is invoked.


Jim Ault
Las Vegas


On 5/22/06 8:39 AM, "Chris Sheffield" <[EMAIL PROTECTED]> wrote:

This is one for those of you developing for both Mac and Windows. I'm
running into a very strange problem, and I'm not sure if it's a Rev
bug or if it has something to do with hardware differences between
Macs and PCs.

Here's a code snippet:

put "01/06/2006" into tDate
convert tDate to seconds
put tDate

Run this in the message box on both a Mac and a PC. See the different
results. Anyone know why this would happen? What I'm ultimately doing
is converting two dates to seconds and then calculating the number of
weeks that have passed between the two dates. I discovered that my
calculations were incorrect on the PC, and my debugging led me to
this. The value on the Mac seems to be the correct one. What's
strange is some dates seem to be correct when converting to seconds,
but others are not. Try "04/28/2006" for example. Converting to
seconds results in the same value on both platforms.

Can anyone help with this? Or does anyone have another way of
calculating the number of weeks between two dates without converting
to seconds first? Have I found a bug I need to report?

Thanks,
Chris

------------------------------------------
Chris Sheffield
Read Naturally
The Fluency Company
http://www.readnaturally.com
------------------------------------------


_______________________________________________
use-revolution mailing list
[email protected]
Please visit this url to subscribe, unsubscribe and manage your subscription
preferences:
http://lists.runrev.com/mailman/listinfo/use-revolution


_______________________________________________
use-revolution mailing list
[email protected]
Please visit this url to subscribe, unsubscribe and manage your subscription preferences:
http://lists.runrev.com/mailman/listinfo/use-revolution

------------------------------------------
Chris Sheffield
Read Naturally
The Fluency Company
http://www.readnaturally.com
------------------------------------------


_______________________________________________
use-revolution mailing list
[email protected]
Please visit this url to subscribe, unsubscribe and manage your subscription 
preferences:
http://lists.runrev.com/mailman/listinfo/use-revolution

Reply via email to