Hello JB,

  We're using Karaf 2.2.8 and Cellar 2.2.4.  We're using the
jre.properties.cxf as we're using CXF.  We install 8 cellar nodes or so with
the following features and bundles:

    * features:addurl mvn:org.apache.cxf.karaf/apache-cxf/2.6.1/xml/features
    * features:install cxf
    * features:addurl
mvn:org.apache.camel.karaf/apache-camel/2.9.2/xml/features
    * features:install camel camel-blueprint camel-eventadmin camel-http4
    * osgi:install -s mvn:org.codehaus.jackson/jackson-core-asl/1.9.7 \
                            mvn:org.codehaus.jackson/jackson-jaxrs/1.9.7 \
                           
mvn:org.codehaus.jackson/jackson-mapper-asl/1.9.7 \
                            mvn:org.codehaus.jackson/jackson-xc/1.9.2 \
                            mvn:org.apache.httpcomponents/httpmime/4.1.2
    * features:addurl
mvn:org.apache.karaf.cellar/apache-karaf-cellar/2.2.4/xml/features
    * features:install eventadmin wrapper webconsole cellar cellar-event
cellar-webconsole
    * wrapper:install

  We're using the standard karaf, cellar, and hazelcast configurations.

  When simultaneously starting the 8 nodes synchronization takes a long time
(20 ~ 30 minutes) along w/ all the Hazelcast exceptions in the log.

thx,
jt

--
View this message in context: 
http://karaf.922171.n3.nabble.com/Cellar-and-horizontal-scalability-issue-tp4025204p4025214.html
Sent from the Karaf - User mailing list archive at Nabble.com.

Reply via email to