Thanks for the detailed information.
I will setup and environment similar to yours.
I keep you posted.
Regards
JB
On 07/12/2012 04:20 PM, da3m0npr0c3ss wrote:
Hello JB,
We're using Karaf 2.2.8 and Cellar 2.2.4. We're using the
jre.properties.cxf as we're using CXF. We install 8 cellar nodes or so with
the following features and bundles:
* features:addurl mvn:org.apache.cxf.karaf/apache-cxf/2.6.1/xml/features
* features:install cxf
* features:addurl
mvn:org.apache.camel.karaf/apache-camel/2.9.2/xml/features
* features:install camel camel-blueprint camel-eventadmin camel-http4
* osgi:install -s mvn:org.codehaus.jackson/jackson-core-asl/1.9.7 \
mvn:org.codehaus.jackson/jackson-jaxrs/1.9.7 \
mvn:org.codehaus.jackson/jackson-mapper-asl/1.9.7 \
mvn:org.codehaus.jackson/jackson-xc/1.9.2 \
mvn:org.apache.httpcomponents/httpmime/4.1.2
* features:addurl
mvn:org.apache.karaf.cellar/apache-karaf-cellar/2.2.4/xml/features
* features:install eventadmin wrapper webconsole cellar cellar-event
cellar-webconsole
* wrapper:install
We're using the standard karaf, cellar, and hazelcast configurations.
When simultaneously starting the 8 nodes synchronization takes a long time
(20 ~ 30 minutes) along w/ all the Hazelcast exceptions in the log.
thx,
jt
--
View this message in context:
http://karaf.922171.n3.nabble.com/Cellar-and-horizontal-scalability-issue-tp4025204p4025214.html
Sent from the Karaf - User mailing list archive at Nabble.com.
--
Jean-Baptiste Onofré
[email protected]
http://blog.nanthrax.net
Talend - http://www.talend.com