HI All,

I'm looking for a way to use the MRP to create a load of washers from a
length of steel pipe which is ordered in from a supplier. A piece of pipe
is cut into 1000 pieces so one productId is chopped up and 1000 items of a
different productId needs to be put into stock and a number of these
washers used further down the production chain.

Assembling the length of pipe from 1000 washers is straight forward enough
- but I need to effectively disassemble the pipe and I cannot see if this
functionality has been implemented. Can anyone point me in the right
direction?