HI All, I'm looking for a way to use the MRP to create a load of washers from a length of steel pipe which is ordered in from a supplier. A piece of pipe is cut into 1000 pieces so one productId is chopped up and 1000 items of a different productId needs to be put into stock and a number of these washers used further down the production chain.
Assembling the length of pipe from 1000 washers is straight forward enough - but I need to effectively disassemble the pipe and I cannot see if this functionality has been implemented. Can anyone point me in the right direction? Many Thanks, -- Rupert Howell Provolve Ltd Front Office, Deale House, 16 Lavant Street, Petersfield, GU32 3EW, UK t: 01730 267868 / m: 079 0968 5308 e: [email protected] w: http://www.provolve.com