In the schedule, the Maximum job execution time (seconds) should be greater than zero. Check that.
Murali. On Tue, Mar 18, 2008 at 1:14 PM, Danilo Batista Medeiros < [EMAIL PROTECTED]> wrote: > hi > i setted the cron expression to 0 0/1 * * * ?, but i cannot trigger > continuum to do a build. > The only way to do it is using the user interface. > > do i have to configure any xml file? > what about the notifiers? do i have to config a xml file too? >
