On Tue, Mar 18, 2008 at 6:37 AM, murali mohan <[EMAIL PROTECTED]> wrote:
> In the schedule, the Maximum job execution time (seconds) should be greater
>  than zero. Check that.

I haven't looked at the code, but I believe zero means 'no limit'.

-- 
Wendy

Reply via email to