On Tue, Mar 18, 2008 at 6:37 AM, murali mohan <[EMAIL PROTECTED]> wrote: > In the schedule, the Maximum job execution time (seconds) should be greater > than zero. Check that.
I haven't looked at the code, but I believe zero means 'no limit'. -- Wendy
