Present were: Erik, Ian, Steve, Frank, Peter, Barry, Josef, Roland, (problems with audio), and others I don't remember anymore (sorry, but they also didn't speak up)
We first talked about plans for 2015. Mentioned were: - ET meeting in Europe, doodle poll about location and time - either in Italy (close to MG meeting) or Sweden (Micra) - either mid-July or mid-end August - Improving timelevel handling and making Carpet more flexible wrt time prolongation orders etc (https://trac.einsteintoolkit.org/ticket/620) - Dependency-based scheduling, to avoid errors and allow potential parallelization - Make tests independent of number of processes, or run on the right number (https://trac.einsteintoolkit.org/ticket/1075, https://trac.einsteintoolkit.org/ticket/1230). - Get tickets under control (https://trac.einsteintoolkit.org/ticket/1698) - Adding some Hydro analysis tools used by Frank and the Parma group - Working on Chemora, adding to the ET eventually - Getting some more interesting single-NS initial data into the ET - Adding Llama. Since Llama is public now, and officially released there would need to be a chaperon. - Including an elliptic solver Specific tickets/issues mentioned were - having a type that is CCTK_INT8 by default on 64-bit platforms Here the consensus seems to be that using CCTK_INT as platform-dependent type should be ok. - Adding a new type CCTK_INT16 - Merging the McLachlan rewrite branch There is a wiki page about that: https://docs.einsteintoolkit.org/et-docs/Rewrite_McLachlan If nobody objects this looks like to be happening soon. - The Jenkins Server will move to the PI. Erik and Ian will coordinate on that, and Frank volunteered to help. - McLachlan will move to bitbucket. The timeframe was not fixed, but is expected to be "soonish". Frank
signature.asc
Description: Digital signature
_______________________________________________ Users mailing list [email protected] http://lists.einsteintoolkit.org/mailman/listinfo/users
