Axil,

I suspect that you are misreading what Rossi stated.  Why would you not think 
that each small ECAT unit has its own microcontroller?  There are approximately 
100 individual ECATs and he has chosen to control each one independently while 
a main control system coordinates them.

If what I believe is true then the power handling required to activate the 
internal heating sections is modest.  This lowers the cost of that function by 
a considerable amount.  Also, failure of each unit can be monitored and the 
faulty ones located quickly and easily replaced.  Rossi likes to operate in a 
practical, simple manner.

Dave

 

 

 

-----Original Message-----
From: Axil Axil <[email protected]>
To: vortex-l <[email protected]>
Sent: Tue, Dec 9, 2014 3:05 pm
Subject: Re: [Vo]:more energy in disputes than from cells



Rossihas publicly stated that he is using over  100 computers to implementhis 
latest control stratagem. From this meager bit of information wecan deduce 
fairly much what is going on with the 1 megawatt clusterE-Cat reactor. That 
number of computers means he is using a SCADAsystem to do the command and 
control function to keep his creation inline.
Theterm SCADA (supervisory control and data acquisition) usually refersto a 
centralized system which monitors and controls the industrialinfrastructure of  
entire sites, or complexes of systems spread outover large areas (anything from 
an industrial plant to a nation).Most localized control actions are performed 
automatically by RemoteTerminal Unit (RTU)s or by Programmable Logic Controller 
(PLC)s.These are computer boards which are controlled by a low 
levelmicrocomputer usually housed in a rack mounted enclosure using a 
fullduplex bus structure to communicate with a master controlstation(MCS). The 
MCS is a custom coded PC that hosts the bus networkand provides a graphical 
user interface to depict the operationalparameters and status of all the 
E-Cats. In a high availabilityapplication, the MCD runs in a ghosted mode with 
a hot backup PC.


Thecost of such a system(a high quality implementation) is substantial. This 
digital Command andControl(C&C) will comprise a large fraction of the cost 
ofRossi's 1 megawatt plant. Even the best of such  systems is prone to bugs, 
out ofprofile behavior and hacking attacks. Usually industrial customerswill 
want to integrate the E-Cat cluster reactor into their factorywide SCADA C&C 
system.


In myopinion, Rossi and Industrial heat have made a mistake in judgment onthis 
reactor design decision. A simplified fail safe (as in a nuclear reactor) 
analog basedcontrol system is best suited to the 1 MW E-Cat cluster reactor.


   





On Tue, Dec 9, 2014 at 12:36 PM, Peter Gluck <[email protected]> wrote:

Dear Friends,


when the New Paradigm of LENR will
arrive, remember me for this too:


http://egooutpeters.blogspot.ro/2014/12/daily-shared-lenr-discoveries-december_9.html


It is the daily info here...more daily than info this time.
Peter



-- 

Dr. Peter Gluck
Cluj, Romania
http://egooutpeters.blogspot.com





Reply via email to