>From what we have been told, what is being tested now IS a commercial product, providing heat to a factory and saving the factory owner a significant amount of money in heating costs.
On Thu, Aug 6, 2015 at 10:45 AM, Orionworks - Steven Vincent Johnson < orionwo...@charter.net> wrote: > From Ashfield, > > > > ... > > > > > The good news is that Aftenposten, Norway's largest newspaper , has > reported > > > they have expert third party confirmation that Rossi's 1 MW thermal LENR > plant > > > is working well. It is now at about 168 days of the 350 day trial. > > > If, as now looks likely, LENR works, it should solve a lot of problems. > > > > I must confess that I have been remiss in keeping track of Rossi's 350 day > 1 MW thermal LENR plant trial. Assuming this latest trial completes and the > data looks good... what happens next? > > > > I don't know enough about this latest trial experiment to grok whether the > engineering & technology involved would be considered reliable enough or > even sufficiently understood such that the components currently be used > could presumably be re-engineered into the design of an actual commercial > product. I may be mistaken on this point, but I'm assuming an attempt to > design an actual commercial product would be the next logical step - > perhaps not to private individuals but for some kind of industrial use, > perhaps for heating large factory buildings cheaply. I'm assuming > industrial oriented safety restrictions could be better enforced in ways > that could not easily be done if sold to the private sector. > > > > Would components from the Vort Collective continuum care to comment? > > > > Regards, > > Steven Vincent Johnson > > OrionWorks.com > > zazzle.com/orionworks > -- Frank Acland Publisher, E-Cat World <http://www.e-catworld.com>