They have almost 100 Ecats already built in a Miami Leonardo factory.
You place them in series to increase the temp and pressure to 500 c @
55 bar (for turbines) and parallel for more energy.  Rossi got his PhD
in Milan where he got his B both in engineering.  The MW plant will be
in Athens.  And there's a factory in Greece.

Doesn't seem to need $$.

Lots of information.

Thanks, Jed!

T

Reply via email to