They have almost 100 Ecats already built in a Miami Leonardo factory. You place them in series to increase the temp and pressure to 500 c @ 55 bar (for turbines) and parallel for more energy. Rossi got his PhD in Milan where he got his B both in engineering. The MW plant will be in Athens. And there's a factory in Greece.
Doesn't seem to need $$. Lots of information. Thanks, Jed! T

