At 10:59 AM 10/5/2011, Jed Rothwell wrote:
Better NOT do it that way. I just told them:

"The secondary cooling loop should be started before the Rossi device is turned on. You should confirm that the inlet and outlet temperatures are the same. In other words confirm that the inlet and outlet thermocouples are calibrated and they agree to within 0.1°C when tap water flows through."

They say ok.

I presume the secondary circuit + non-operating eCat will cool down fairly quickly.

Could you please ask them to take photographs of everything (all tube sections, the reactor bulge, chimney etc etc) with a ruler -- both length and diameter -- so that the volumes can also be calculated.