His representative in Switzerland is very, to put mildly, suspicious:

http://translate.google.com/translate?sl=de&tl=en&js=n&prev=_t&hl=en&ie=UTF-8&layout=2&eotf=1&u=http%3A%2F%2Fwww.transaltec.ch%2Ffacma%2Fdesign.php%3Fdesign%3D2

Due to physical *conditions, such systems* are *only economically viable in
the MW range.* Since no fuel is required classical, there are*over* an
operating period of *say 40 years, substantial savings and profits* for the
plant operator.
Currently, facilities can be ordered with a *power range of 3, 10 and 150
MW.* The delivery time is about 16 to 18 months from receipt of order, with
50% of the financing of Professor Szabo's finance company EEL can be
provided. The pure *investment costs* - excluding land and building power
plants - are calculated for the specified performance levels at *8, 20 and
245 million USD.* *
*When 3MW power
plant<http://translate.googleusercontent.com/translate_c?hl=en&ie=UTF8&prev=_t&rurl=translate.google.com&sl=de&tl=en&twu=1&u=http://www.transaltec.ch/pdfs_aso/3MW8MUSDEquityFin.pdf&usg=ALkJrhghJZ9xugNCGvyNOnc29jPUvEzxGQ>
 is the *payback period* of capital (50% of total costs) at *2 years.* The
size and weight of the entire magnetic material (core sheet), which charges
50% make up the final price of the system can be controlled by a
parameterized formula to simple way to
calculate<http://translate.googleusercontent.com/translate_c?hl=en&ie=UTF8&prev=_t&rurl=translate.google.com&sl=de&tl=en&twu=1&u=http://www.transaltec.ch/pdfs_aso/PaperbyProfessorLIS%5B1%5D.pdf&usg=ALkJrhjWmEc6XTrvIQPFvKVm2KPzLvcwZQ>
 .

********************

So, Rossi got a guy ,to resell his ecat, that has a financing company
which, unlike Rossi's escrow method, can indeed run away with a lot of
money.

So, skeptics will say that while he cannot cheat ,
his commercial representatives can do that, and in this way, Rossi can
cheat, by proxy.

Reply via email to