Robert,
Gotta admit, from what Rossi has stated, the Jan 12 image may be from
Jan 12, despite the stained floor no longer being stained.
Note the tubing that connected the water supply to the pumps is seen
lying at the left side and parallel to the BBB. It even has the aluminum
duck tape on the section ends that can be seen in the Oct 28 image of
the feed water supply piping.
I now have 3 issues:
1) Either the BBB was never shipped to the customer, despite what Rossi
claims.
Here I would say there is no way the 28 Oct unit on the floor could be
shipped. Not with the water pumps mounted on welded on support shelves
and the virtually non supported water piping above the pumps. Add to
that the issue of the top mounted reactors. Of course the pump support
shelves, the piping and the top mounted reactors could have been removed
and secured inside the BBB. As they old and new photos and the angles of
the piping are identical, this would suggest they have not been removed
and replaced.
2) It was torn down, shipped to the customer, assembled, torn down
again, shipped back to Rossi and reassembled exactly as it was before it
started the movement process. Rossi has claimed this has not happened.
I'm inclined to agree with Rossi on this point.
3) The plant in the 12 Jan images is not capable of operation. It is
under construction as evidenced by many non connected wires inside the
plant. There are no support equipment to run the plant under load nor is
there any evidence of any NI control system other than the original Tan
Box on the right front side of the BBB. So where was any of the reported
development done with NI, the customer and the Customer's engineer?
So I'm left with 2 possibilities:
1) The Jan 12 image was taken before 28 Oct 2011 and everything is sweet.
2) The BBB has never left Rossi's workshop. Some work is happening on
the inside but nothing outside. All the 1 MW operational load and
circulating water support systems have been removed and the existing
control system has been disconnected.
Andrea Rossi please explain what is happened.
AG
On 19/01/2012 4:33 PM, Robert Leguillon wrote:
You guys must have missed the post by Patrick Ellul:
1. Italo R. January 18th, 2012 at 2:02 PM Dear Ing. Rossi, I have
watched this interview with you in Bologna realized on the 12th of
January 2012 http://www.youtube.com/watch?v=odkfAjqA4pc In it appears a
1 MW container. May I ask you if that container is the same used in the
last test with ing. Fioravanti and already sold to your customer? Thank
you. Kind regards, Italo R.
2. Andrea Rossi January 18th, 2012 at 6:44 PM Dear Italo R. Yes, it is
the same: we are still working on it with National Instruments and with
the Customer. It will take another month before it will be ready. Warm
Regards, A.R.
- the floor strings are a moot point...someone must have mopped