Daniel,

It is also obvious that there are no E-Cats heating that facility in Italy. You may ask is heating needed in a Florida E-Cat manufacturing plant?

There are no coolant circulation systems nor heat exchangers attached to the 12 Jan imaged BBB. How can there be any testing of the BBB in operation?

There was a single Fat Cat unit in test mode in the next room, with a prototype home E-Cat on the next table. This sure seems like Rossi's Italian R&D centre that he talks of.

AG


On 20/01/2012 12:52 AM, Daniel Rocha wrote:
The problem it is that he said THAT container with its contents were
sold. Or so, that's what I understood.

2012/1/19 Energy Liberator <[email protected]
<mailto:[email protected]>>

    AG

    If he is working on fixing leaking gaskets then he doesn't need the
    whole plant working so perhaps they are using the unit on the table
    for stress testing. Likewise NI may not require the whole plant
    working to do their work.

    There is also the possibility that this unit is only a test bed and
    that the work NI and the other engineers are doing to improve the
    plant is done at the factory.

    The more I think about it, it is unlikely that Rossi is building the
    plants at the location that the interview was filmed and Oct 28 test
    was held. It just doesn't have the space and facilities from what I
    can see. If he needs to be building 13 plants he'd want enough space
    where he can have a number of plants being built in parallel. I also
    think that he is keeping the location of the manufacturing secret so
    he definitely not using this location for production. It's obvious
    that there is not much going on in that workshop.

Reply via email to