Daniel,
It is also obvious that there are no E-Cats heating that facility in
Italy. You may ask is heating needed in a Florida E-Cat manufacturing plant?
There are no coolant circulation systems nor heat exchangers attached to
the 12 Jan imaged BBB. How can there be any testing of the BBB in
operation?
There was a single Fat Cat unit in test mode in the next room, with a
prototype home E-Cat on the next table. This sure seems like Rossi's
Italian R&D centre that he talks of.
AG
On 20/01/2012 12:52 AM, Daniel Rocha wrote:
The problem it is that he said THAT container with its contents were
sold. Or so, that's what I understood.
2012/1/19 Energy Liberator <[email protected]
<mailto:[email protected]>>
AG
If he is working on fixing leaking gaskets then he doesn't need the
whole plant working so perhaps they are using the unit on the table
for stress testing. Likewise NI may not require the whole plant
working to do their work.
There is also the possibility that this unit is only a test bed and
that the work NI and the other engineers are doing to improve the
plant is done at the factory.
The more I think about it, it is unlikely that Rossi is building the
plants at the location that the interview was filmed and Oct 28 test
was held. It just doesn't have the space and facilities from what I
can see. If he needs to be building 13 plants he'd want enough space
where he can have a number of plants being built in parallel. I also
think that he is keeping the location of the manufacturing secret so
he definitely not using this location for production. It's obvious
that there is not much going on in that workshop.