server seems stuck. resending

----- Original Message ----- 
From: Andrew 
To: [email protected] 
Sent: Sunday, May 26, 2013 5:20 PM
Subject: Re: [Vo]: About the March test


p22.
Emitted PowerE-Cat HT2 = (741.3 + 17 + 58) [W] = (816.3± 2%) [W] = (816±16) [W] 
(24) 

Instantaneous Power ConsumptionE-Cat HT2 = (920 - 110) [W ]= 810 [W] (25) 

  ----- Original Message ----- 
  From: David Roberson 
  To: [email protected] 
  Sent: Sunday, May 26, 2013 5:17 PM
  Subject: Re: [Vo]: About the March test


  Where does this statement appear?   I suspect that you are misreading.

  Dave
  -----Original Message-----
  From: Andrew <[email protected]>
  To: vortex-l <[email protected]>
  Sent: Sun, May 26, 2013 8:12 pm
  Subject: Re: [Vo]: About the March test


  I continue to be worried about the fact that the input and output power are 
measured equal in the report in the pulse ON state. One would have thought 
that, if the device truly is generating its own energy, that this should not be 
the case.

  Andrew
    ----- Original Message ----- 
    From: Andrew 
    To: [email protected] 
    Sent: Sunday, May 26, 2013 4:23 PM
    Subject: Re: [Vo]: About the March test


    Eric,

    The idea here is that the extras (DC and/or RF) are undetectable to the 
meter using clamp ammeters (we know this for a fact), and when this extra gets 
passed on to the control box, it's able to pass them on to the device, perhaps 
with some customisation. The device, being chiefly ohmic, will dissipate DC and 
will likely also dissipate RF. So no customisation by the control box of the 
extras is in principle necessary - the power simply gets passed along to the 
device, which consumes it and generates heat as a result.

    Now, as I've described, the shenanigans chiefly occur during the pulse OFF 
state, so there will have to be some customisation in the control box. The idea 
here is to dissipate the extras during pulse ON and pass them along during 
pulse OFF. The mains doesn't know about the pulse schedule, so cannot itself 
switch the extras in or out (actually, a Byzantine arrangement could be made to 
work in this way, but I'm not going that far out).

    Since no type of electronics control circuitry could survive colocated with 
the device, the implication is that the control box has to dissipate 
significant power continuously. That raises a question about the control box 
temperature. Since it's a sealed unit, and we're talking a couple hundred watts 
at least, it would have to get bloody hot. There's another data point we don't 
have. But you'd think they would have mentioned it.

    I'm talking myself out of this, aren't I? :)

    Andrew


      ----- Original Message ----- 
      From: Eric Walker 
      To: [email protected] 
      Sent: Sunday, May 26, 2013 4:00 PM
      Subject: Re: [Vo]: About the March test


      On Sun, May 26, 2013 at 3:45 PM, Andrew <[email protected]> wrote: 


        B) seems unlikely because it would require batteries, and Hartman 
states that it was much lighter than that. Battery technology does not exist 
that could be that light, and/or occupy so little volume, and make up that 
total energy difference as measured over 100+ hours. Therefore, it seems that 
the only workable theory of possible deception is A).



      I recall Hartman clarifying that measurements were taken on the mains 
side (from Jed's post).  I am not too familiar with circuitry.  I assume that 
either (1) the measurement equipment (including the laptop) will need some kind 
of single-phase conversion in order to work off of the same mains, or (2) they 
will have to be routed to a separate source (in the case where the mains side 
has been tampered with).  Assuming (1) for the moment, how easy or hard would 
it be to filter out hidden DC or AC when constructing the single phase 
conversion in order to protect the measurement equipment?  Would you need a 
heavy transformer?


      Eric

Reply via email to