-----BEGIN PGP SIGNED MESSAGE----- Hash: SHA1 Hi everybody! I just wanted to tell you that I plan to tag 1.6.5 on Sunday. I would like this one to be the last release in the 1.6.x stable series. If you got anything left that should go into that series, please make sure to commit it ASAP.
Since 1.6.x is soon to be "basically done" (at least from my point of view) it is time to plan for 1.8.x. In general (or theory? ;) ) we wanted to try a 6 month release cycle. Since the last release was in March, we should "soon" release 1.8.x if we really want to hold to the old plans. Releasing it in September will not work, though maybe October is possible? What do you currently have left? This is what I see should be considered: * There are *many* bugs open at the moment. Well above 60 bugs IIRC. I think we really should reduce the list of open bugs before 1.8 is out. * I want to have at least a 6 week string freeze. I already told translators to start working on things that we know are basically done (most campaigns), but a string freeze is a whole lot different. Please tell me what you see as open points that have to be tackled before we can release 1.8. What do you think is a realistic timeline? Cheers, Nils Kneuper aka Ivanovic -----BEGIN PGP SIGNATURE----- Version: GnuPG v2.0.11 (GNU/Linux) iEYEARECAAYFAkqhkuUACgkQfFda9thizwWs+wCeM1ZEUd+6xJbpFsqYCAZ5cQQr lvMAoJkRejAnn5p8/iCXlxz2Chkog1kA =9DWu -----END PGP SIGNATURE----- _______________________________________________ Wesnoth-dev mailing list [email protected] https://mail.gna.org/listinfo/wesnoth-dev
