Hi, We would like to get automatically ( in order to have a specific SLA report) from the "State Change Timeline" the longest unavailability for a device. Has somebody already developped the necessary Sql scripting ? And generally is there some SQL scripting similar examples ?
ORSENNA Jean Philippe Senckeisen 14 Rue Gambetta 78600 MESNIL LE ROI Tel : (33) 1 34 93 35 35 Fax : (33) 1 34 93 95 75 www.orsenna.fr Please visit http://www.ipswitch.com/support/mailing-lists.html to be removed from this list. An Archive of this list is available at: http://www.mail-archive.com/whatsup_forum%40list.ipswitch.com/
