On Oct 27, 2015 7:29 AM, "Risker" <[email protected]> wrote: > > On 27 October 2015 at 09:57, Brad Jorsch (Anomie) <[email protected]> > wrote: > > > On Tue, Oct 27, 2015 at 8:02 AM, Risker <[email protected]> wrote: > > > > > The incident report does not go far enough back into the history of the > > > incident. It does not explain how this code managed to get into the > > > deployment chain with a fatal error in it. > > > > > > Actually, it does. Erik writes "This occured because the patch for the > > CirrusSearch repository that removed the schema should have been deployed > > before the change that adds it to the WikimediaEvents repository." > > > > In other words, there was nothing wrong with the code itself. The problem > > was that the multiple pieces of the change needed to be done in a > > particular order during the manual backporting process, but they were not > > done in that order. > > > > If this had waited for the train deployment, both pieces would have been > > done simultaneously and it wouldn't have been an issue, just as it wasn't > > an issue when these changes were done in master and automatically deployed > > to Beta Labs. > > > > > That's a start, Brad. But even as someone who has limited experience with > software deployment, I can think of at least half a dozen questions that > I'd be asking here: > > - Why wasn't it part of the deployment train This was a fix for something that broke during the previous deployment train. Specifically a hook was changed in core and not noticed in the extenaion until the events from javascript stopped coming into our logging tables. > - As a higher level question, what are the thresholds for using a SWAT > deployment as opposed to the regular deployment train, are these standards > being followed, and are they the right standards. (Even I notice that most > of the big problems seem to come with deployments outside of the deployment > train.)
This is documented at https://wikitech.wikimedia.org/wiki/SWAT_deploys. I'm not sure about previous outages but in this case the patch matches the documented limits. My intuition is a that a dep > - How was the code reviewed and tested before deployment Code was re > - Why did it appear to work in some contexts (indicated in your response > as master and Beta Labs) but not in the production context Because, as stated in the report and by brad, the code itself works. The code was redeployed after the outage with no errors because the second time it was deployed in the correct order. This is why code review didn't catch the fatal and the error didn't show up in beta labs. This was an issue primarily with deployment process. > - How are we ensuring that deployments that require multiple sequential > steps are (a) identified and (b) implemented in a way that those steps are > followed in the correct order > > > Notice how none of the questions are "what was wrong with the code" or "who > screwed up". They're all systems questions. This is a systems problem. > Even in situations where there *is* a problem with the code or someone > *did* screw up, the root cause usually comes back to having single points > of failure (e.g. one person having the ability to [unintentionally] get > problem code deployed, or weaknesses in the code review and testing > process). > > Risker/Anne > _______________________________________________ > Wikitech-l mailing list > [email protected] > https://lists.wikimedia.org/mailman/listinfo/wikitech-l At a higher level, this was a 9 minute outage instead of a 2 or 3 minute outage due to two mistakes I made while doing the revert. Both of these are in the incident report. First the monitor I was watching from our logserver to tell me it needs a rollback did not report this error adding a minute or two before the rollback started. We have other monitors that have been added in the past year that I should have been looking at as well. Second I reverted multiple patches from within gerrit (our code review tool) which takes too long when the site is down. I can only point to inexperience here, others who have previously taken our sites down informed me that the proper was is to revert is directly on the deployment server. Iv been deploying patches and to wmf for a couple years and have always in the past reverted through gerrit, but those didn't need the extra speedy recovery as the site was not down, it was only logging errors or some specific piece of functionality was not working. Going up another level comes to our deployment tooling specifically. RelEng is working on a project called scap3 which brings our deployment process closer to what you should expect from a top 10 website. It includes canary deployments (eg 1% of servers) along with a single command that undoes the entire deployment. Canary deployments allow to see an error before it is deployed everywhere, and a one command rollback operation would have likely brought the site back 3 to 4 minutes faster than how I reverted the patches. I did not link the scap3 portions as an actionable because, in my mind, that's not a single actionable thing. Scap3 is a major overhaul of our deploy process. Additionally this is already a priority in RelEng. _______________________________________________ Wikitech-l mailing list [email protected] https://lists.wikimedia.org/mailman/listinfo/wikitech-l