Siddharth Seth created YARN-429:
-----------------------------------

             Summary: capacity-scheduler config missing from yarn-test artifact
                 Key: YARN-429
                 URL: https://issues.apache.org/jira/browse/YARN-429
             Project: Hadoop YARN
          Issue Type: Bug
          Components: resourcemanager
    Affects Versions: 2.0.3-alpha
            Reporter: Siddharth Seth
            Assignee: Siddharth Seth
            Priority: Blocker


MiniYARNCluster and MiniMRCluster are unusable by downstream projects with the 
2.0.3-alpha release, since the capacity-scheduler configuration is missing from 
the test artifact.
hadoop-yarn-server-tests-3.0.0-SNAPSHOT-tests.jar should include the default 
capacity-scheduler configuration. Also, this doesn't need to be part of the 
default classpath - and should be moved out of the top level directory in the 
dist package.

--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators
For more information on JIRA, see: http://www.atlassian.com/software/jira

Reply via email to