I have been testing the Zenoss Core product for approximately 9 months in anticipation of an enterprise wide rollout. I've been more than impressed with the product, there is potential for us to move to the Enterprise product at some point(money permitting). I am currently running on the stack installer v2.3.2 on RHEL5.2 I have run into 1 major issue that seems consistent, even after a fresh install. Whenever zenmodeler reaches a point that it is "Running 100+ clients" it hangs. zenmodeler seems to operate for a bit, reaching numbers in the 40-50 client range. Sometimes suddenly, other times gradually, zenmodeler reaches 100+ clients and hangs. zenmodeler stop will not stop the process, only a kill -9 will work.
-------------------- m2f -------------------- Read this topic online here: http://forums.zenoss.com/viewtopic.php?p=30566#30566 -------------------- m2f -------------------- _______________________________________________ zenoss-users mailing list [email protected] http://lists.zenoss.org/mailman/listinfo/zenoss-users
