I have been testing the Zenoss Core product for approximately 9 months in 
anticipation of an enterprise wide rollout.  I've been more than impressed with 
the product, there is potential for us to move to the Enterprise product at 
some point(money permitting).  I am currently running on the stack installer 
v2.3.2 on RHEL5.2  I have run into 1 major issue that seems consistent, even 
after a fresh install.  Whenever zenmodeler reaches a point that it is "Running 
100+ clients" it hangs.  zenmodeler seems to operate for a bit, reaching 
numbers in the 40-50 client range.  Sometimes suddenly, other times gradually, 
zenmodeler reaches 100+ clients and hangs.  zenmodeler stop will not stop the 
process, only a kill -9 will work.




-------------------- m2f --------------------

Read this topic online here:
http://forums.zenoss.com/viewtopic.php?p=30566#30566

-------------------- m2f --------------------



_______________________________________________
zenoss-users mailing list
[email protected]
http://lists.zenoss.org/mailman/listinfo/zenoss-users

Reply via email to