M.Canales.es wrote these words on 04/02/05 04:17 CST: > Working on it. The commit will be very big for the list, but I will send a > post with the revison number.
Manuel, this was not supposed to happen until Sunday night. That's when I told everyone it was scheduled for, and folks needed time to get the new DTD installed. Some things are done according to a plan and a schedule. I wish you would have read the entire email and understood that April 3 is not until tomorrow. Sigh...... -- Randy rmlscsi: [GNU ld version 2.15.94.0.2 20041220] [gcc (GCC) 3.4.3] [GNU C Library stable release version 2.3.4] [Linux 2.6.10 i686] 08:54:01 up 9:27, 4 users, load average: 0.27, 0.06, 0.02 -- http://linuxfromscratch.org/mailman/listinfo/blfs-dev FAQ: http://www.linuxfromscratch.org/blfs/faq.html Unsubscribe: See the above information page