Hi I can't find a way to configure constraints in pacemaker so that with these resources:
Res1 Res2 Res3 Res4 Res5 with current colocation constraints : Res2 with Res1 Res3 with Res2 Res4 with Res1 Res5 with Res4 and current order symmetrical constraints : Res2 after Res1 Res3 after Res2 Res4 after Res1 Res5 after Res4 and migration-threshold=1 on all resources . What I want it that if I have a failure for example on Res3 is that all the 5 Ressources are migrated. Is there a solution ? For example , with an HA LVM configuration and VM resources : Res1=VGA Res2=FS-img-VM1 (where are the VM1 image and .xml) (FS-img-VM1 is on VGA LV) Res3=VM1 Res4=FS-img-VM2 (where are the VM2 image and .xml) (FS-img-VM1 is on another VGA LV) Res5=VM2 So current constraints are so that VGA is activated before the FS-img is mounted and before the VM is started. But I want that if the VM1 fails, it can migrate on another node (together with all other 4 resources) but with only the constraints above, the VGA stalls the migration of the VM ... Is there any solution by constraints configuration ? Note : we can't use group resources for now, because VMs are remote-nodes. Thanks Alain Moullé _______________________________________________ Linux-HA mailing list is closing down. Please subscribe to us...@clusterlabs.org instead. http://clusterlabs.org/mailman/listinfo/users _______________________________________________ Linux-HA@lists.linux-ha.org http://lists.linux-ha.org/mailman/listinfo/linux-ha