The major refactorings planned for 8.0.x are complete. There are a few
minor refactorings that can either done before the first stable release
or (if they turn out to be a little bigger) left until 9.0.x.
Therefore I have the following tentative plan in mind:
- start the next 8.0.x RC release
2013/11/15 Mark Thomas ma...@apache.org
The major refactorings planned for 8.0.x are complete. There are a few
minor refactorings that can either done before the first stable release
or (if they turn out to be a little bigger) left until 9.0.x.
Cool. Since there was never a 7.1, I suppose
Rémy Maucherat r...@apache.org wrote:
2013/11/15 Mark Thomas ma...@apache.org
The major refactorings planned for 8.0.x are complete. There are a
few
minor refactorings that can either done before the first stable
release
or (if they turn out to be a little bigger) left until 9.0.x.
Cool.