[PSES] Sr. EMC/EMI Test Technician Job at Broadcom in Irvine, CA

2014-01-20 Thread Neven Pischl
Broadcom in Irvine has an opening for a Senior Engineering Technician in the EMC lab:   http://jobs.broadcom.com/job/Irvine-Senior-Engineering-Technician-EMC-EMI-Test-CA-92602/37641900/   Please do NOT reply to this email, use the link above or send me a mail to      

Re: [PSES] Equipment rack for GR1089 testing - does it have to be metal?

2013-11-20 Thread Neven Pischl
  From: Neven Pischl [mailto:neve...@comcast.net] Sent: Tuesday, November 19, 2013 7:07 PM To: EMC-PSTC@LISTSERV.IEEE.ORG Subject: [PSES] Equipment rack for GR1089 testing - does it have to be metal?   Hello All, Is there a formal requirement, by either Telcordia/NEBS or by the major

[PSES] Equipment rack for GR1089 testing - does it have to be metal?

2013-11-19 Thread Neven Pischl
Hello All, Is there a formal requirement, by either Telcordia/NEBS or by the major telecom carriers that the equipment rack (i.e. not the cable rack) be metal, when testing radiated immunity per the GR1089? I understand it is the usual practice - I have only seen such tests with a metal

Re: [PSES] Equipment rack for GR1089 testing - does it have to be metal?

2013-11-19 Thread Neven Pischl
document   http://www.verizonnebs.com/TPRs/VZ-TPR-9305.pdf   Regards, Mike   From: Neven Pischl [mailto:neve...@comcast.net] Sent: Tuesday, November 19, 2013 7:07 PM To: EMC-PSTC@LISTSERV.IEEE.ORG Subject: [PSES] Equipment rack for GR1089 testing - does it have to be metal

Re: [PSES] Cat5e or Cat6 in emissions test

2013-02-07 Thread Neven Pischl
Gbit ethernet is requir ed to work over CAT5e so for formal EMC compliance you generally  have to test with CAT5e. CAT6 are better cables, if you care for per formance and if you have a special use, but not for compliance testing Ethernet products (unless for some reaosn you limit a produ ct

Re: [PSES] Troubleshooting Kit (Part 1) Published

2012-06-01 Thread Neven Pischl
A common-mode voltage probe is an invaluable tool I have used for years to fix emission coming out of telecom-type ports, especially ethernet. I published an article in the Trans. of the IEEE EMC Symp. in Seattle, 1999 . I have mofdified it since (the old one was for 10/100 ethernet and

Re: [PSES] Spread-Spectrum Clock Question

2012-02-10 Thread Neven Pischl
I would like to thank sincerely to all who responded, I appreciate it. I am not going to react to any discussions on whether it is cheating or not :), it was not anywhere in my mind when I posted the question and I hope this topic does not degrade :).   But, I'd like to summarize a

[PSES] Spread-Spectrum Clock Question

2012-02-09 Thread Neven Pischl
Hello, I wonder if anyone can help with a question I have on spread spectrum clock (SSC). I am trying to validate the effectiveness of a SSC chip to reduce emission. I measure with the peak detector. With the SSC enabled (up to 2.5% down-spread) I expect the level measured with a

Re: Shielding Effectivness Question

2001-06-11 Thread Neven Pischl
I thank all off you who answered my question. Neven -Original Message- From: Neven Pischl [mailto:npis...@cisco.com] Sent: Tuesday, June 05, 2001 12:16 PM To: emc-p...@majordomo.ieee.org; si-l...@silab.eng.sun.com Subject: Shielding Effectivness Question I would appreciate

Shielding Effectivness Question

2001-06-05 Thread Neven Pischl
, Neven Pischl

Re: Good book for SMPS EMC ???

2001-05-09 Thread Neven Pischl
I bought my book from IEEE, about five years ago. Neven Original Message - From: Aschenberg, Mat matt.aschenb...@echostar.com To: 'Neven Pischl' npis...@cisco.com; emc-p...@ieee.org Sent: Wednesday, May 09, 2001 6:31 AM Subject: RE: Good book for SMPS EMC ??? Where is a good place

Re: Good book for SMPS EMC ???

2001-05-09 Thread Neven Pischl
ELECTROMAGNETIC COMPATIBILITY IN POWER ELECTRONICS By Laszlo Tihany IEEE Press ISBN 0-7506-2379-9 Regards, Neven At 10:51 PM 5/8/01 +, Paul Slavens wrote: Greetings All, Could anyone recommend a good book on EMC design for Switch Mode Power Supplies ? Thanks in Advance Paul

REMINDER: SCValley IEEE EMC Society Meeting - TODAY

2001-05-08 Thread Neven Pischl
at SGI in Mountain View, 1600 Amphitheatre Pkwy., building 40, in the Presentation Center above the lobby. The social gathering will start at 5:30 PM, and food and drinks will be available. The technical presentation will start at 7:00 PM. You can visit us at: www.scvemc.org Regards, Neven Pischl

Santa Clara Valley IEEE EMC Society Meeting Announcement

2001-04-05 Thread Neven Pischl
. The social gathering will start at 5:30 PM, and food and drinks will be available. The technical presentation will start at 7:00 PM. The Chapter's newsletter is attached. You can download a copy of Spectral Lines with meeting details from: www.scvemc.org Regards, Neven Pischl

Re: Site Correlation

2001-01-11 Thread Neven Pischl
Allen, the main problem you will have is not whether to use signal generator or a comb generator, but the difference in the radiation characteristic of your source for correlation and the DUTs that you will later put in the chamber. You will measure a lots of near-field in you 3m or smaller

SCV EMC Society January 2001 Meeting Announcement

2001-01-02 Thread Neven Pischl
how to use charge elements to better understand the fields of full-size currents, and the physical origins of those fields. Regards, Neven Pischl

December Meeting of SCV Chapter of the EMC Society

2000-12-08 Thread Neven Pischl
://www.scvemc.org/ Neven Pischl --- This message is from the IEEE EMC Society Product Safety Technical Committee emc-pstc discussion list. To cancel your subscription, send mail to: majord...@ieee.org with the single line: unsubscribe emc-pstc For help

SCV EMC Society Meeting - Tuesday, October 10, 2000

2000-10-10 Thread Neven Pischl
Invitation to: SCV EMC Society Meeting BLUETOOTH - A Viking King Tuesday, October 10, 2000 The October Santa Clara Valley EMC Society meeting will be held at SGI in Mountain View, 1600 Amphitheatre Pkwy., building 40, in the Presentation Center above the lobby. Dinner will start at 5:30, and

Re: Near field measurements

2000-09-13 Thread Neven Pischl
You may try NIST at Boulder, CO. Neven Pischl - Original Message - From: wo...@sensormatic.com To: emc-p...@majordomo.ieee.org Sent: Thursday, September 07, 2000 10:15 AM Subject: Near field measurements We need to make human exposure measurements for our FCC Part 15 submission

[SI-LIST] : Job Opening at Cisco in San Jose, CA - EMC Design Engineer

2000-03-15 Thread Neven Pischl
. If you are interested, please contact me at npis...@cisco.com (408) 527 7874 Or you can contact Tom Lindeland (hiring manager) tlind...@cisco.com (408) 526 4976 Neven Pischl To unsubscribe from si-list or si-list-digest: send e-mail to majord...@silab.eng.sun.com. In the BODY of message

Re: LVD Essential Requirement for Radiation Protection

2000-01-14 Thread Neven Pischl
cause ionization, but only at very high intensities, and not as its prime effect. UV, RF, MW, ELF.. is hence non-ionizing radiation Neven Pischl - Original Message - From: Tony Firth tony.fi...@quester.com To: emc-p...@majordomo.ieee.org Sent: Thursday, January 13, 2000 4:12 PM Subject: re

Re: Cell Phone Hazards?

1999-12-10 Thread Neven Pischl
). Neven Pischl - Original Message - From: Ken Javor ken.ja...@emccompliance.com To: Grasso, Charles (Chaz) gra...@louisville.stortek.com; 'Pettit, Ghery' ghery.pet...@intel.com; mkel...@es.com; emc-p...@majordomo.ieee.org Sent: Thursday, December 09, 1999 6:38 PM Subject: Re: Cell Phone

Re: Near field magnetic probes

1999-11-24 Thread Neven Pischl
Antonio, I've seen problems the other way around, i.e. the probes that have been calibrated in far-field conditions, with the probe, the leads, and the readout unit exposed to far field measuring erroneously in near-field. Measurements obtained by a probe calibrated in far-field conditions or in

Re: Awards for Worst EMC/PS qualities

1999-03-11 Thread Neven Pischl
Some time ago, in a far-away land, I saw a product that was on the lab bench for some initial functionality testing (1-st rev. of the device). A radio was close by, plugged to the same power circuit. The test engineer could not listen to the radio due to the interference with the noise coming from

Re: Awards for Worst EMC/PS qualities

1999-03-10 Thread Neven Pischl
Some time ago, in a far-away land, I saw a product that was on the lab bench for some initial functionality testing (1-st rev. of the device). A radio was close by, plugged to the same power circuit. The test engineer could not listen to the radio due to the interference with the noise coming from