Ken, Thanks for
the reply – your answer pretty much fits in with what I had intended to do. Once the replication is out to all DCs –
then anything that needed to work with the extended schema could – is that
correct? Or am I reading between
the lines? R/Bill -----Original
Message----- If you read the upgrade
documentation for W2K3, you will find that you have to extend the forest schema
before you install the first W2K3 DC. Extend the schema on the empty root
domain with the forestprep option, then allow sufficient time for the schema
extension to replicate through ALL DCs in your forest. Ken
Adams -----Original
Message----- To
All, I have recently been
advised that one of the domains within our forest has a need to start using
some of the W2K3 attributes. The current setup throughout
the forest is W2K and SP4 with an empty root and then child domains truncated
on downward. The forest will be migrated to W2K3 at some point in the not too
distant future – but it will not be in time to satisfy the needs of this one
domain. Is it possible for me to
extend the forest schema [presume from the empty root] by running W2K3
forestprep and staying at the current W2K? R/Bill |
Title: Message
- [ActiveDir] W2K SCHEMA EXTEND Brown, Bill [contractor]
- RE: [ActiveDir] W2K SCHEMA EXTEND Adams, Kenneth W \(Ken\)
- RE: [ActiveDir] W2K SCHEMA EXTEND Brown, Bill [contractor]
- RE: [ActiveDir] W2K SCHEMA EXTEND Adams, Kenneth W \(Ken\)
- RE: [ActiveDir] W2K SCHEMA EXTEND Eric Fleischman
- RE: [ActiveDir] W2K SCHEMA EXTEND Brown, Bill [contractor]
- RE: [ActiveDir] W2K SCHEMA EXTEND Tony Murray
- RE: [ActiveDir] W2K SCHEMA EXTEND Dean Wells
- RE: [ActiveDir] W2K SCHEMA EXTEND Brown, Bill [contractor]
- RE: [ActiveDir] W2K SCHEMA EXTEND Murray-Smith Tony CF CH
- RE: [ActiveDir] W2K SCHEMA EXTEND Dean Wells