That's easy enough.
Chuck McCown wrote:
I would just make a coil, perhaps 18-24 inches in diameter. Secure it
with clips and zip ties.
*From:* Jay Weekley
*Sent:* Monday, August 20, 2018 9:50 AM
*To:* AnimalFarm Microwave Users Group ; Principal WISPA Member List
*Subject:* [AFMUG] Fiber optic slack/cable management
I need advice. We are providing a backup connection to a local bank.
We ran pre-terminated fiber from a wireless link to where their
primary connection is. >From there an existing fiber link runs to
their server room inside the bank. The problem is that I ordered way
too much fiber and have about 30 feet of slack to work with. Attached
is a picture of the back board I'm going to work with. The fiber is
circled at the top of the picture and the splice case is circled
toward the lower right. How would you route the cable and secure it to
the back board as well as manage that much slack? At this point
trimming and reterminating is not an option.
--
*Jay Weekley*
*Cyber Broadband
*
------------------------------------------------------------------------
--
AF mailing list
[email protected]
http://af.afmug.com/mailman/listinfo/af_af.afmug.com
--
*Jay Weekley*
*Cyber Broadband
*
--
AF mailing list
[email protected]
http://af.afmug.com/mailman/listinfo/af_af.afmug.com