I'm looking at some rural places where for some reason the power company
chose to run their pole line about 100 yards off the road behind the
houses.
I cannot drive a bucket truck to some of these places. Sometimes you'd
be crushing a corn field to get there or other times it's brushy and
untamed and you couldn't drive anything less than a forestry mulcher
through it.
How do you equip someone for fusion splicing out in the bush like that?
If we build on this route, we'll have to be able to splice out there at
some point. Do you clear a space on the ground and set up a tent or do
you climb the pole and set up an aerial tent and lash a work table to
the pole?
-Adam
--
AF mailing list
[email protected]
http://af.afmug.com/mailman/listinfo/af_af.afmug.com