You put a DC power supply up on the tower?

I can see why.....we're only talking 150W per base station and at 240v you could run a whole cluster of them on a 16/2.

My hangup would be that I don't know what power supply I would trust up there.


On 3/31/2020 9:10 AM, Chuck McCown wrote:
I used to just run 240vac.

Sent from my iPhone

On Mar 31, 2020, at 6:58 AM, Adam Moffett <dmmoff...@gmail.com> wrote:



That's not a bad idea either.

On 3/31/2020 8:47 AM, can...@believewireless.net wrote:
We've used MSTs on towers and buildings. https://www.commscope.com/product-type/cabinets-panels-enclosures/closures-terminals/fiber-access-terminals/itemmst-04mh00-b2000u/

On Tue, Mar 31, 2020 at 7:58 AM Adam Moffett <dmmoff...@gmail.com <mailto:dmmoff...@gmail.com>> wrote:

    Isn't it a 4-pin power connector?

    2 pairs of 16 gauge ought to be sufficient.


    On 3/30/2020 11:22 PM, Kurt Fankhauser wrote:
    > I was un-aware that Medusa AP's needed 8 gauge wire at 300' but i
    > guess it could make sense.

-- AF mailing list
    AF@af.afmug.com <mailto:AF@af.afmug.com>
    http://af.afmug.com/mailman/listinfo/af_af.afmug.com


--
AF mailing list
AF@af.afmug.com
http://af.afmug.com/mailman/listinfo/af_af.afmug.com

-- 
AF mailing list
AF@af.afmug.com
http://af.afmug.com/mailman/listinfo/af_af.afmug.com

Reply via email to