You put a DC power supply up on the tower?
I can see why.....we're only talking 150W per base station and at 240v
you could run a whole cluster of them on a 16/2.
My hangup would be that I don't know what power supply I would trust up
there.
On 3/31/2020 9:10 AM, Chuck McCown wrote:
I used to just run 240vac.
Sent from my iPhone
On Mar 31, 2020, at 6:58 AM, Adam Moffett <dmmoff...@gmail.com> wrote:
That's not a bad idea either.
On 3/31/2020 8:47 AM, can...@believewireless.net wrote:
We've used MSTs on towers and buildings.
https://www.commscope.com/product-type/cabinets-panels-enclosures/closures-terminals/fiber-access-terminals/itemmst-04mh00-b2000u/
On Tue, Mar 31, 2020 at 7:58 AM Adam Moffett <dmmoff...@gmail.com
<mailto:dmmoff...@gmail.com>> wrote:
Isn't it a 4-pin power connector?
2 pairs of 16 gauge ought to be sufficient.
On 3/30/2020 11:22 PM, Kurt Fankhauser wrote:
> I was un-aware that Medusa AP's needed 8 gauge wire at 300' but i
> guess it could make sense.
--
AF mailing list
AF@af.afmug.com <mailto:AF@af.afmug.com>
http://af.afmug.com/mailman/listinfo/af_af.afmug.com
--
AF mailing list
AF@af.afmug.com
http://af.afmug.com/mailman/listinfo/af_af.afmug.com
--
AF mailing list
AF@af.afmug.com
http://af.afmug.com/mailman/listinfo/af_af.afmug.com