We’re drilling a development, and we have some spare 2” sitting around, but 
wondering whether for two rows of 50 homes we could really get away with 
ordering a roll of 1 1/4” to do that rest? We’re likely doing GPON and have 
some 48 count ribbon fiber for the project, and some 4 and 12 count drops. Will 
we ever wish we used 2” for everything?
-- 
AF mailing list
[email protected]
http://af.afmug.com/mailman/listinfo/af_af.afmug.com

Reply via email to