Base installed last week. Two hours to erect it. Gin pole last section wind kicked in. Yagi. Air terminal. Super flexv and number 1 ground wire 3 man crew
Jaime Solorza On Apr 22, 2015 8:44 PM, "Josh Reynolds" <[email protected]> wrote: > How long to assemble and install the tower itself? How big was the crew? > Gin pole? > > Josh Reynolds > CIO, SPITwSPOTS > www.spitwspots.com > > On 04/22/2015 04:55 PM, Jaime Solorza wrote: > >> >> One done one to go >> >> Jaime Solorza >> >> >
