Cable run and grounding. ..conduit through base and out to enclosure. All enclosed and sealed.
Jaime Solorza On Apr 22, 2015 9:01 PM, "Jaime Solorza" <[email protected]> wrote: > Base installed last week. Two hours to erect it. Gin pole last section > wind kicked in. Yagi. Air terminal. Super flexv and number 1 ground > wire 3 man crew > > Jaime Solorza > On Apr 22, 2015 8:44 PM, "Josh Reynolds" <[email protected]> wrote: > >> How long to assemble and install the tower itself? How big was the crew? >> Gin pole? >> >> Josh Reynolds >> CIO, SPITwSPOTS >> www.spitwspots.com >> >> On 04/22/2015 04:55 PM, Jaime Solorza wrote: >> >>> >>> One done one to go >>> >>> Jaime Solorza >>> >>> >>
