Cable run and grounding. ..conduit through base and out to enclosure.  All
enclosed and sealed.

Jaime Solorza
On Apr 22, 2015 9:01 PM, "Jaime Solorza" <[email protected]> wrote:

> Base installed last week. Two hours to erect it.  Gin pole last section
> wind kicked in.   Yagi. Air terminal. Super flexv and number 1 ground
> wire   3 man crew
>
> Jaime Solorza
> On Apr 22, 2015 8:44 PM, "Josh Reynolds" <[email protected]> wrote:
>
>> How long to assemble and install the tower itself? How big was the crew?
>> Gin pole?
>>
>> Josh Reynolds
>> CIO, SPITwSPOTS
>> www.spitwspots.com
>>
>> On 04/22/2015 04:55 PM, Jaime Solorza wrote:
>>
>>>
>>> One done one to go
>>>
>>> Jaime Solorza
>>>
>>>
>>

Reply via email to