Anyone ever use sonnet tubes drilled into the ground and then poured full of concrete for guy wire anchor points? We have a 100' rohn that we just purchased. Two anchors are solid but the third is anchored on the top of what could best be described as a stone and concrete pillar. The concrete is all weather beaten and falling apart and if I push hard I can move the entire pillar. It's a hard location to get machinery into but I can get a drilling machine in for putting in tubes. It can do a 16" tube dia.
Thoughts? Brandon
