Anyone ever use sonnet tubes drilled into the ground and then poured full of
concrete for guy wire anchor points? We have a 100' rohn that we just
purchased. Two anchors are solid but the third is anchored on the top of
what could best be described as a stone and concrete pillar. The concrete is
all weather beaten and falling apart and if I push hard I can move the
entire pillar.  It's a hard location to get machinery into but I can get a
drilling machine in for putting in tubes. It can do a 16" tube dia.

 

Thoughts?

 

Brandon

 

Reply via email to