We got a sweet location the other day on a ridge, its a few of these bins, it will be about 100' up on a ridge. Its windy as shit up there. I would have pics of the actual on but both my phones froze up when I tried taking the pics. Its a dormant silo so we are free to do what we want. Initially all we are doing is a micropop but the path from this bad boy gets us a midpoint for a redundancy we have needed for a long time. So eventually there will be a few EPMP APs up there and 2 backhauls (maybe 3) all with Radiowaves 2' HP parabolics with the skirts.
The rail is good heavy guage steel it just doesnt have much lateral stability. We can back the nuts off the bolts coming through the top but we are limited to what we can reach through the hatch, apparently the bolts will fall out so we can do stabilizer bars, just short. Since its a dormant silo, we can come through the work area across the diameter of the railing, but i see a moron tower monkey tripping and falling off of it. Anybody dealt with these and have ideas aside from magnetics? -- If you only see yourself as part of the team but you don't see your team as part of yourself you have already failed as part of the team.
