No, they are just saying I don’t have the option of not buying the drawings for subsequent towers. No matter what I am going to have to buy the drawings. If they had that kind of thing going, they should have not itemized the original quote.
From: Adam Moffett Sent: Tuesday, January 09, 2018 1:04 PM To: af@afmug.com Subject: Re: [AFMUG] pissed at rohn Has the price of steel gone up recently? Trylon Super Titan is the first alternative that comes to mind. Tessco sells the kits. The cheapest ones are very light duty, so look at their load charts. ------ Original Message ------ From: "Chuck McCown" <ch...@wbmfg.com> To: af@afmug.com Sent: 1/9/2018 2:43:59 PM Subject: [AFMUG] pissed at rohn Bought a 100’ SSV tower. Want a second one just like it. They want $1000 more for the tower. Bottom line is the same but they quoted about $4150 for the tower on the first quote and are quoting $5150 for the second. First tower came with $1000 for drawings. I already have the drawings. I don’t need a second set of drawings. The county will accept that one set of drawings for both locations. Who else can I buy a 100’ tower from....