isnt rohn made in peoria? you want that plant should have some storm damage
or some embers of that California fire should happen to land on their roof?
sometimes these things, manufacturing joints, they aint so wired up good,
you know, sometimes the plants burn down

On Tue, Jan 9, 2018 at 2:14 PM, Chuck McCown <[email protected]> wrote:

> No, they are just saying I don’t have the option of not buying the
> drawings for subsequent towers.  No matter what I am going to have to buy
> the drawings.
> If they had that kind of thing going, they should have not itemized the
> original quote.
>
> *From:* Adam Moffett
> *Sent:* Tuesday, January 09, 2018 1:04 PM
> *To:* [email protected]
> *Subject:* Re: [AFMUG] pissed at rohn
>
> Has the price of steel gone up recently?
>
> Trylon Super Titan is the first alternative that comes to mind.  Tessco
> sells the kits.  The cheapest ones are very light duty, so look at their
> load charts.
>
>
>
> ------ Original Message ------
> From: "Chuck McCown" <[email protected]>
> To: [email protected]
> Sent: 1/9/2018 2:43:59 PM
> Subject: [AFMUG] pissed at rohn
>
>
> Bought a 100’ SSV tower.
> Want a second one just like it.
> They want $1000 more for the tower.  Bottom line is the same but they
> quoted about $4150 for the tower on the first quote and are quoting $5150
> for the second.
>
> First tower came with $1000 for drawings.  I already have the drawings.  I
> don’t need a second set of drawings.  The county will accept that one set
> of drawings for both locations.
>
> Who else can I buy a 100’ tower from....
>
>
>

Reply via email to