What is the top and bottom section sizes for this 100 foot tower? On Tue, Jan 9, 2018 at 10:07 PM, Steve Jones <[email protected]> wrote:
> isnt rohn made in peoria? you want that plant should have some storm > damage or some embers of that California fire should happen to land on > their roof? sometimes these things, manufacturing joints, they aint so > wired up good, you know, sometimes the plants burn down > > On Tue, Jan 9, 2018 at 2:14 PM, Chuck McCown <[email protected]> wrote: > >> No, they are just saying I don’t have the option of not buying the >> drawings for subsequent towers. No matter what I am going to have to buy >> the drawings. >> If they had that kind of thing going, they should have not itemized the >> original quote. >> >> *From:* Adam Moffett >> *Sent:* Tuesday, January 09, 2018 1:04 PM >> *To:* [email protected] >> *Subject:* Re: [AFMUG] pissed at rohn >> >> Has the price of steel gone up recently? >> >> Trylon Super Titan is the first alternative that comes to mind. Tessco >> sells the kits. The cheapest ones are very light duty, so look at their >> load charts. >> >> >> >> ------ Original Message ------ >> From: "Chuck McCown" <[email protected]> >> To: [email protected] >> Sent: 1/9/2018 2:43:59 PM >> Subject: [AFMUG] pissed at rohn >> >> >> Bought a 100’ SSV tower. >> Want a second one just like it. >> They want $1000 more for the tower. Bottom line is the same but they >> quoted about $4150 for the tower on the first quote and are quoting $5150 >> for the second. >> >> First tower came with $1000 for drawings. I already have the drawings. >> I don’t need a second set of drawings. The county will accept that one set >> of drawings for both locations. >> >> Who else can I buy a 100’ tower from.... >> >> >> >
