What is the top and bottom section sizes for this 100 foot tower?

On Tue, Jan 9, 2018 at 10:07 PM, Steve Jones <[email protected]>
wrote:

> isnt rohn made in peoria? you want that plant should have some storm
> damage or some embers of that California fire should happen to land on
> their roof? sometimes these things, manufacturing joints, they aint so
> wired up good, you know, sometimes the plants burn down
>
> On Tue, Jan 9, 2018 at 2:14 PM, Chuck McCown <[email protected]> wrote:
>
>> No, they are just saying I don’t have the option of not buying the
>> drawings for subsequent towers.  No matter what I am going to have to buy
>> the drawings.
>> If they had that kind of thing going, they should have not itemized the
>> original quote.
>>
>> *From:* Adam Moffett
>> *Sent:* Tuesday, January 09, 2018 1:04 PM
>> *To:* [email protected]
>> *Subject:* Re: [AFMUG] pissed at rohn
>>
>> Has the price of steel gone up recently?
>>
>> Trylon Super Titan is the first alternative that comes to mind.  Tessco
>> sells the kits.  The cheapest ones are very light duty, so look at their
>> load charts.
>>
>>
>>
>> ------ Original Message ------
>> From: "Chuck McCown" <[email protected]>
>> To: [email protected]
>> Sent: 1/9/2018 2:43:59 PM
>> Subject: [AFMUG] pissed at rohn
>>
>>
>> Bought a 100’ SSV tower.
>> Want a second one just like it.
>> They want $1000 more for the tower.  Bottom line is the same but they
>> quoted about $4150 for the tower on the first quote and are quoting $5150
>> for the second.
>>
>> First tower came with $1000 for drawings.  I already have the drawings.
>> I don’t need a second set of drawings.  The county will accept that one set
>> of drawings for both locations.
>>
>> Who else can I buy a 100’ tower from....
>>
>>
>>
>

Reply via email to