Hi Kai,

Thank you so much for your feedback. These issues will be addressed in the next 
revisions.
Best regards,
Sabine

From: Kai GAO <[email protected]>
Sent: Sunday, July 21, 2019 7:40 AM
To: Randriamasy, Sabine (Nokia - FR/Paris-Saclay) 
<[email protected]>
Cc: IETF ALTO <[email protected]>
Subject: Re: [alto] Second WGLC of draft-ietf-alto-cost-calendar (version -12)

Hi Sabine and all,

I reviewed the diff between -11 and -12. The changes generally look good but I 
spotted some minor issues:

- Title of Section 3.1: resources -> resource or resource's.
- In the first sentence of the last paragraph in section 2.4, the term "cost 
Calendar" should be capitalized.
- In Section 4.1 and Section 5, some contents are using "ALTO client" instead 
of "ALTO Client".

Best,
Kai


On Sat, Jul 20, 2019 at 11:51 AM Jensen Zhang 
<[email protected]<mailto:[email protected]>> wrote:
Hi all,

I reviewed the whole diff of the cost calendar draft between version -11 and 
version -12. The modification looks good to me. I only have one small 
suggestion:

In the new section 2.1 "Terminology":


o  Calendar, Cost Calendar: When used with a capital "C", these terms

   refer to an ALTO Cost Calendar.



'with a capital "C"' may be confusing here. Because the first letters of both 
"Cost" and "Calendar" are 'C'.  People may think "Cost calendar" is also a 
term. Maybe "with capitalized words" is better?

Thanks,
Jensen


On Fri, Jul 5, 2019 at 3:10 PM Vijay Gurbani 
<[email protected]<mailto:[email protected]>> wrote:
One major correction:

s/The current WGLC will be open until Jul-12-2019/The current WGLC will be open 
until Jul-21-2019/

The current WGLC will proceed until Jul-21-2019.

Thanks.

On Fri, Jul 5, 2019 at 1:53 PM Vijay Gurbani 
<[email protected]<mailto:[email protected]>> wrote:
All: The chairs will like to start a second WGLC for 
draft-ietf-alto-cost-calendar-12 [0].

During the first WGLC, a couple of discusses were raised as documented in [1].  
More specifically,

1/ Ben indicated a couple of edge cases that need to be resolved.
2/ Alvaro noted that there is IPR tied to the precursor of this draft, as 
detailed in [2].  The chairs will like to ensure that the WG is aware of the 
IPR declaration inherited by draft-ietf-alto-cost-calendar, and duly considers 
it during the second WGLC.

Version -12 of the document (the one being WGLC'd) addresses the IESG discusses 
and comments, as well as a review by one of the chairs (Vijay).

The current WGLC will be open until Jul-12-2019 (the start of the IETF week).  
Please post your comments on this draft to the WG mailing list, even if the 
comment is simply to say that you support (or not) moving this work ahead.

The chairs  will summarize the status of the draft at the end of WGLC period.
[0] https://tools.ietf.org/html/draft-ietf-alto-cost-calendar-12
[1] https://datatracker.ietf.org/doc/draft-ietf-alto-cost-calendar/ballot/
[2] 
https://datatracker.ietf.org/ipr/search/?submit=draft&id=draft-ietf-alto-cost-calendar

Thank you.

- vijay
_______________________________________________
alto mailing list
[email protected]<mailto:[email protected]>
https://www.ietf.org/mailman/listinfo/alto
_______________________________________________
alto mailing list
[email protected]<mailto:[email protected]>
https://www.ietf.org/mailman/listinfo/alto
_______________________________________________
alto mailing list
[email protected]
https://www.ietf.org/mailman/listinfo/alto

Reply via email to