On Wed, Nov 28, 2018 at 11:17 AM Austin S. Hemmelgarn <[email protected]>
wrote:

> Based on your configuration, your tapes are configured to store just
> short of 800GB of data.
>
> The relevant lines then are these two:
>
> flush-threshold-scheduled 50
> flush-threshold-dumped 50
>
>
I misunderstood the man pages there and for some reason thought that volume
referred to the holding disk. Probably because I was reading way too
fast....


> In your case, I'd suggest figuring out the average amount of data you
> dump each run, and then configuring things to start flushing when about
> half that much data has been dumped.  That will still have the taping
> run in parallel with the dumping, but will give you enough of a buffer
> that the taper should never have to wait for dumps to finish.
>

So over the last 13 runs, the:

-- smallest volume size has been 152G (19% tape capacity)
-- average volume size has been 254G (32% tape capacity)
-- largest volume size has been 612G (76% tape capacity)

So do the following values look "reasonable" based on those numbers:

flush-threshold-scheduled 25
flush-threshold-dumped 0

That should target the larger sizes which are the ones which tend to lap
into the next business day.

Kind regards,
Chris

Reply via email to