Hello all, I've been working on a graph, and I set it up so that a number of different new nodes (CRITERION_A_SCORE.E60, CRITERION_B_SCORE.E60, CRITERION_C_SCORE.E60, etc.) all reference the same authority document (EVALUATION_SCORE_AUTHORITY_DOCUMENT.E32), which is actually just the numbers 0-3. I thought this would work, but I'm not so sure anymore. The following has happened in the RDM:
In Arches, Evaluation Score is listed correctly, with the numbers 0-3 included as concepts. In Dropdown Lists, Evaluation Score is not listed, nor are any of the Criterion nodes. In Entity Nodes, the Criterion nodes are listed. Strangely, they have an arrow as if they were dropdowns, but don't contain any narrower concepts (see below). <https://lh3.googleusercontent.com/-XgBrGCpCSSo/Vkn_Q9rd4vI/AAAAAAAAAYQ/cfgBEKJ2ayk/s1600/entities.PNG> My conclusion is that there is a problem with having multiple nodes reference the same authority document, though I don't see any mention of that in the documentation. (This is different than seeing the same node reference the same authority document (NAME_TYPE.E55 > NAME_TYPE_AUTHORITY_DOCUMENT.E32) in multiple graphs.) In this specific case I think I'll do away with the authority documents and just control the input in the forms, but clarification on the general rules would be much appreciated for future reference. Thanks! -- -- To post, send email to [email protected]. To unsubscribe, send email to [email protected]. For more information, visit https://groups.google.com/d/forum/archesproject?hl=en --- You received this message because you are subscribed to the Google Groups "Arches Project" group. To unsubscribe from this group and stop receiving emails from it, send an email to [email protected]. For more options, visit https://groups.google.com/d/optout.
