Hi,
is it technically possible to spool and despool at the same time?

For example (fictitious values)
given: 100GB Volume
50GB Spoolsize

- Tape job starts spooling 50 GB: 10 min
- writing (despooling) to tape: 10 min
- after despooling, spool the next 50gb: 10 min
- despooling 50gb: 10min
= total 40 minutes

if we despool and spool at the same time, we gain much time!

- spooling first part 50GB 10min
- despooling frist 50GB to tape, while spooling the next 50GB 10min
- despooling the next 50GB 10min
= total 30miutes

so that would be 1/3 faster. If you have large/much jobs that would gain 
enormous time.
Thanks
Claas


-- 
You received this message because you are subscribed to the Google Groups 
"bareos-users" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to [email protected].
To post to this group, send email to [email protected].
For more options, visit https://groups.google.com/d/optout.

Reply via email to